Fleming Treatment Facility Project
Fleming Wastewater Treatment Facility
Owner: Town of Fleming
Engineer: JVA, Inc.
Value: $2,620,667
Job Description:
New evaporative lagoon wastewater treatment facility –included tying in a new force main line at an existing manhole, boring under US Hwy 6 to run the force main to an influent manhole at the new pump station building, running effluent piping to a flow control structure / evaporative lagoons.